PROJECTS
POWER PROJECTS
Title: Dema Emergency Power Plant
Project Value: USD 2, 5 million
Client: Aggreko Power Solutions.
SCOPE: Fossil was contracted to carry out the civil works on the largest diesel
power plant in the country on behalf of Aggreko Power Solutions. This project
was historic as it marked the largest power plant established by Aggreko at one
go, delivering a massive 200MW into the Zimbabwe Grid. The Plant also has a
capacity to produce 30% of Zimbabwe's peak power requirements. The project
was completed in record time with well over 20000m3 of gravel being hauled,
conditioned and compacted within 6 weeks.
SPECIFIC WORK ELEMENTS: Bitumen Surfacing, Concrete works including blast
walls and a fuel loading bay, Water Reticulation, Fencing, Construction of a
4million liter Fuel Storage Facility, Electrical Earthing and Lighting.
CONCRETE PROJECTS
Title: Supply, fabrication, construction, installation, erection, testing and commissioning of a 2000MT LPG Depot in Ruwa
Project Value: USD 7.8 million
Client: National Oil Infrastructure Company of Zimbabwe
SCOPE: Fossil was contracted to carry out a unique project on behalf of
National Oil Infrastructure Company of Zimbabwe. The Project marks the
largest LPG Depot (2000MT) of NOIC. The project commenced in January 2018
and is currently ongoing. Immense careis to be taken to protect the environment and ensure the depot will be built in asustainable manner.
SPECIFIC WORK ELEMENTS: Design and construction of 2km rigid flexible pavements with respective drainage system, Oce buildings, Structural steel shades, 4 million ltrwater tank, 20000MT LPG tanks and concrete structures
Title: Mabvuku New Fuel Gantry
Project Value: USD 12 million
Client: National Oil Infrastructure Company (NOIC)
SCOPE: Fossil Contracting completed the construction of a Fuel Gantry Depot in
Mabvuku for NOIC. The depot is dispatching fuel from the main Feruka line and
Msasa Fuel Storage to Trucks that supply the whole country and also export.
The infrastructure houses huge high-volume mechanical pumps that sit on 13000m2 of concrete pavement (trucks parking lot), mechanical grating for drainage works and steel canopy structures.
SPECIFIC WORK ELEMENTS: Concrete works, Storm water drainage, Mechanical
works and Electrical Works. Mechanical Grating for drainage works including steel
fabrication and installation of Steel canopy structures construction and modification.
ROAD CONSTRUCTION
Title: REHABILITATION OF NGEZI-SELOUS ROAD 0-13KM
Project Value: USD 6.5 Million
Client: ZIMPLATS
SPECIFIC WORK ELEMENTS:
Reclaiming works of depth 150mm with 2% cement stabilization
Road shoulder widening
40mm asphalt laying
culverts extension
bridge widening
road marking and signage.
Title: CHISHAWASHA MEMORIAL PARK PROJECT
Project Value: USD 8,3 Million
Client: Nyaradzo Life Assurance
SPECIFIC WORK ELEMENTS:
Spray and Chip Surfacing
Shelverts construction
Road earthworks and stormwater drainage
Road marking and signage
ASPHALT WORKS
Title: City of Harare Emergency Road Rehabilitation
Project Value: USD 25 Million
Client: Harare City Council
SCOPE: Fossil Contracting amongst other well-reputed civil contractors was
contracted to participate in the emergency road rehabilitation of Harare roads.
The project involves reconstruction of existing roads and surfacing.
Reclaiming of existing roads, Earthworks, Drainage structures, Asphalt Laying
SPECIFIC WORK ELEMENTS: Spray & Chip, pothole patching and Road Resealing.
Title: Harare Mutare Road (Section Goromonzi Toll Gate - Melfort)
Project Value: USD 8,3 Million
Asphalt Laying
Client: MINISTRY OF TRANSPORT & INFRASTRUCTURE DEVELOPMENT
(Departmentment of Roads)
AVIATION PROJECTS
Title: Puma Aviation Depots
Project Value: USD 1.81 Million
Client: Puma Aviation Global
SCOPE: As part of Puma`s expansion into Zimbabwe's market, Fossil was
awarded the contract to build 3 brand new Fuel Depots at the major Airports in
Zimbabwe. The depots were all done concurrently whilst spread across the
country, located in Harare, Bulawayo and Victoria Falls. The project set a new
standard in construction of Fuel Handling Facilities in the country as the latest
technologies were used on the build. Immense care was taken to protect the
environment and ensure the depots were built in a sustainable manner.
SPECIFIC WORK ELEMENTS: Earthworks, Concrete Works including slabs and
plinths, Electrical Installations (Veeder Root System, Back Up Generators and
STAHL System), Firefighting Installations (Foam Systems, Water Storage and
Fire Water main rings), Stormwater Drainage, Fencing, Water and Sewer
Reticulation. Mechanical Fuel Tank Installation and dispatch high volume pumps
installation.
REFERENCE PROJECTS:
PROJECT NAME: Re-construction of Lunar Road
CLIENT: Sakunda Holdings
CONTACT: Eng. Mutungwazi 0712 421 444
SERVICE PROVIDED: Civil works contractor
STATUS: Complete PERIOD: May 2013 – June 2013
PROJECT NAME: Extensions Harare-BeitbridgeMushagashi Toll Gate Plaza
CLIENT: ZINARA
SERVICE PROVIDED: Road Widening: Earth Works, Storm Water Drainage & associated Concrete Works
STATUS: Complete PERIOD: Nov 2013 – Mar 2014
PROJECT NAME: Rehabilitation of 52km Lalapanzi-Tongogara Road
CLIENT: Tongogara Rural District Council CONTACT:
SERVICE PROVIDED: Reconstruction and rehabilitation of the whole road, opening drains, compacting, Earth Moving, gravel stock piling,
repairing drainage, culvates.
STATUS: Complete PERIOD: June 2012 - Dec 2012
OTHER CONTRACTED PROJECTS:
Clients: Murray Roberts, Econet&Netone
Specific Works Elements:
Installation of Base Station, Rigging and Concrete Works
Client: Puma Energy
Specific Works Elements:
Service Stations, Concrete & Fuel Depots
Client: Tensor
Specific Works Elements:
Surfacing, Bitumen Works & Earth Work
Client: Bitumen World
Specific Works Elements:
Reclamation Bridges & Shelverts
Client: BCHOD
Specific Works Elements:
Concrete Plinths, Towers, Concrete Structures, Platforms & Rigging
Client: Bindura Municipality
SPECIFIC WORK ELEMENTS:
Edge break repairs, pothole patching, crack sealing, slurry seal,
Pre-levelling depressions, reconstruction of failed sections and resealing.
Client: Zibagwe Rural District Council
Title: Sherwood Road Surfacing:
SPECIFIC WORK ELEMENTS:
Bitumen Surfacing. Earthworks, Road markings and Signage.
Client: Redcliff Town Council
SPECIFIC WORK ELEMENTS
Road Earthworks, Bituminous Surfacing, Water Reticulation & Sewerage
Reticulation.